Specified systems
Further documentation required prior to CCC issue
As per the required CCC documentation that will be listed on the Building Consent (Form 5) and also listed on the documents tab in Objective Build, you will be required to submit a completed B525 Specified System Information Sheet for each system.
Please merge these as one document to upload via Objective Build.
Non-Electronic Applications
If you are unable to submit your building consent application electronically via Objective Build, you will need to provide a Specified System form for each system being added, modified or removed as part of your supporting documentation.